• -12%
WATER TREATMENT PLANT TUNNEL 2000L

Water tunnel treatment plant

0/5 z 0 recenzji produktu Write a review Write a review
4,927.80 PLN 12%
4,336.46 PLN tax incl
3,525.58 PLN tax excl
The lowest price of this product in the last 30 days before the discount was 4,188.63 PLN gross

sale offer ends in just

Treatment plant:
Delivery time 3-5 working days
Ask about the product
  • Sewage treatment plant with infiltrating tunnels
  • One-chamber and two-chamber settler
  • Models for 4,6,8 to 10 users

 

Download PDF

Product compliance details: Manufacturer responsible for the product

Responsibility for the Product

Marseplast

Manufacturer Marseplast Sp. z o.o. Podłęska 17 32-005 Niepołomice Poland info@marseplast.com

Marseplast Sp. z o.o. is a Polish manufacturer with over 30 years of experience in the field of plastic products. The company manufactures products using injection and rotomoulding methods, targeting the water and sewage, agricultural, garden and municipal construction industries. Marseplast's product range includes, among others, rainwater tanks, septic tanks, household treatment plants, manholes, settling tanks and elements of water and sewage infrastructure. The company uses raw materials from reliable European suppliers, taking care of material quality and product durability.

Marseplast's products meet the requirements of European and Polish standards, especially the PN-EN 12566-1 standard concerning domestic sewage treatment plants. The company has a TÜV certificate confirming type conformity for the selected product range. In addition, "JUMBOTANK" type tanks have a National Declaration of Properties (WB-JUMBOTANK), a product property assessment numbered 1017-CPR-10.761.736 and a hygienic certificate HK/W/0424/01/2017. The products are covered by a quality guarantee (e.g. tightness) and tested for durability and functionality.

Drop Water tunnel sewage treatment plant

Reasons to have a domestic tunnel sewage treatment plant (ecological septic tank)

  • Cheap and simple solution to wastewater treatment
  • Maintenance-free, no need for electricity
  • Two-chamber configuration possible for 2000 l and 3000 l settling tank
  • Warranty period is 5 years
  • Also suitable for installation in poorly permeable soil

Operation description of the drainage wastewater treatment plant

The wastewater treatment process can be divided into two stages. In the first, so-called anaerobic stage, raw sewage flows by gravity into the septic tank. Here, the wastewater is self-purified. Heavy substances are separated and fall to the bottom of the tank. Fats and oils form so-called dross. The pre-treated wastewater then flows through the filter to the second purification stage which takes place in the infiltration drain. This stage uses a natural aerobic process, involving the biochemical breakdown of pollutants by bacteria. In order for the treatment process to be effective, it must last for at least three days - hence an adequate volume of septic tank is required for the sewage treatment plant to function properly. A similar equivalent of such a treatment plant is the EKO TUNEL septic tank. We invite you to take a look at our offer!


Sewage treatment plant septic tank

The septic tank is the basic equipment used for wastewater treatment in domestic wastewater treatment plants. It cooperates with the sewage infiltration system consisting of infiltration tunnels. It is made using the rotomolding method, which ensures 100% tightness of the product. There is a baffle inside the septic tank, thus making the tank a two-chamber tank. The tank must not be used as a free-standing tank.

The DropWater septic tank can be matched with:



Standards and certificates

Standard: Declaration of conformity - manufacturing of the treatment plant according to EN 12566-1:2000/A1:2003 and EN 12566-1:2004/A1:2006
Attestation: Product type conformity test protocol 1017 - CPR - 07.262.695


Name
Number of users [p.e.].
Elements of the kit
Volume of settling tank [l]
Drainage
Length [m]
Width [m]
Height [m]
Inlet height [m]
Outlet height [m]
Tank weight [kg]
Water Tunnel 4
2-4
  • Water trap 2 chamber 2.0 - 1 pc.
  • distribution sump - 1 item.
  • drainage tunnel 150 l - 6 pcs.
  • drainage pipe - 6 pcs.
  • geotextile - 50 m.b.
  • aeration mushroom - 1 item.
2 000
6 x infiltration tunnel
2,40
0,87
1,57
1,27
1,18
89
Water Tunnel 6
4-6
  • Water 2-chamber sludge trap 3.0 - 1 pc.
  • distribution sump - 1 item.
  • drainage tunnel 150 l - 8 pcs.
  • drainage pipe - 8 pcs.
  • geotextile - 50 m.b.
  • aeration mushroom - 2 pcs.
3 000
8 x infiltration tunnel
2,70
1,21
1,57
1,24
1,18
107
Water Tunnel 8
7-8
  • Water settling tank 1 chamber 4.0 - 1 pc.
  • Filtering material-puzzolana - 2 x 25 kg
  • distribution sump - 1 pc.
  • drainage tunnel 150 l - 10 pcs.
  • drainage pipe - 10 pcs.
  • geotextile - 50 m.b.
  • aeration mushroom - 2 pcs.
4 000
10 x infiltration tunnel
2,40
1,50
1,86
1,57
1,50
159
Water Tunnel 10
9-10
  • Water settling tank 1 chamber - 1 pc.
  • Filtering material-puzzolana - 50kg
  • distribution sump - 1 pc.
  • drainage tunnel 150 l - 12 pcs.
  • drainage pipe - 12 pcs.
  • geotextile - 50 m.b.
  • aeration mushroom - 2 pcs.
5 000
12 x infiltration tunnel
2,40
1,50
2,20
1,90
1,83
203

Comments All reviews

Summary

0

(0 Reviews)

Select a row below to filter reviews.

  • 5
    (0)
  • 4
    (0)
  • 3
    (0)
  • 2
    (0)
  • 1
    (0)

Write a review