• -17%
Biological treatment plant with tunnels PRIMAtech-E SBR Try tank
  • Biological treatment plant with tunnels PRIMAtech-E SBR Try tank
  • Biological treatment plant with tunnels PRIMAtech-E SBR Try tank
  • Biological treatment plant with tunnels PRIMAtech-E SBR Try tank

Biological treatment plant with tunnels PRIMAtech-E SBR Try tank

5/5 z 1 recenzji produktu Write a review Write a review
16,869.45 PLN 17%
14,001.64 PLN tax incl
11,383.45 PLN tax excl
The price has not changed
29-324
Treatment plant:
Lead time approx. 7-14 days
Ask about the product
  • With Try HDPE tank (three-layer)
  • Complete with drainage tunnels
  • From 2 to 14 users

 

Download PDF

Product compliance details: Manufacturer responsible for the product

Responsibility for the Product

Euro-Plast

Manufacturer P.P.U.H. EURO-PLAST Remigiusz Waldowski Słońska 1 87-720 Ciechocinek Poland euro-plast@wp.pl

EURO-PLAST is a Polish manufacturer that has been in operation since 2002, specialising in wastewater treatment plants, rainwater harvesting tanks, zero-entrainment tanks, grease separators and process tanks. The company also produces biopreparations to support the operation of infiltration systems.

EURO-PLAST products meet safety and quality requirements, are CE marked and comply with the EN 12566-1/A1 standard, and the infiltration tunnels have the ITB-KOT-2021/1675 certificate. All products have the required attestations and technical approvals, and the manufacturer provides declarations of conformity, instructions for use and technical support.

PRIMAtech-E SBR complete biological sewage treatment plant with infiltration tunnels - three-layer Try tank

Complete biological sewage treatment plant with infiltration tunnels. The PRIMAtech-E SBR household treatment plant is designed for domestic and domestic wastewater. The treatment plant is characterised by high efficiency at the level of: BOD5 - 98.8%, COD - 95.0%, Total Suspended Solids - 98.0%. Its advantages also include a small pit area, low operating costs, no electrical equipment in the tank and low sludge volumes. The Siemens controller is very user-friendly due to its intuitive interface. In addition to this, the controller has an automatic system to notify the user of periodic maintenance. It informs the user by means of traffic lights (LEDs). It can be connected via Ethernet communication. It saves process data. Connects to other devices by Drag & Drop. Micro SD card logging.

Drainage tunnels are a very good solution for smaller catchment areas. They can be used to create long drainage lines (strands). The advantage of infiltration tunnels is that they can be installed quite shallow. They are characterised by their large volume, which ensures that the tunnel does not become clogged. It is more efficient than a classic drainage system.

The ST extension 20 cm - 50 cm high is compatible with the TRY treatment tank.


Wastewater treatment takes place in the innovative triple-wall
(two-chamber) Try tank. The tank wall consists of a triple structure. It is characterised by very high strength and resistance to external conditions. In addition, the multilayer wall provides thermal insulation. The tank is manufactured from high-density HDPE polyethylene. This is a material widely used in the industry. It does not fade or corrode. It is resistant to chemicals, including corrosive wastewater. The design of the tank and the very good properties of the polyethylene ensure a high degree of tightness and durability. The risk of leakage is reduced to a minimum.

Przekrój zbiornika Try


The PRIMAtech-E SBR treatment plant operates on the principle of a sequential biological reactor.
In the primary settling tank, the wastewater is mechanically treated. The second chamber acts as a bioreactor and secondary settling tank. The wastewater is then directed to an infiltration drain.

What distinguishes the PRIMAtech treatment plant from other solutions is the real-time clock.
During the initial start-up, the installer makes the settings and one of them is the time clock, on the basis of which the plant operates. At set times, the controller sends signals to the treatment plant and starts the subsequent stages of the treatment process. This system has been developed on the basis of statistical data about the users' daily routine. For example, in the morning hours there is a high consumption of water, which is caused by preparations for the working day. The second highest consumption during the day is observed in the afternoon and evening (returning from work). The PRIMAtech wastewater treatment plant is adapted to the lifestyle of its users. It triggers the successive stages of the process so that the wastewater is treated optimally, maintaining the highest efficiency.

The process is divided into 5 stages:


1. filling - wastewater treated in the primary settling tank is pumped into the bioreactor;
2. aeration - biological wastewater treatment is initiated by sequential aeration;
3. Sedimentation - sludge settles to the bottom of the tank;
4. decantation - the treated effluent is pumped to an effluent pipe and then to the receiving tank;
5. recirculation - excess sludge is pumped into the secondary settling tank;


Schemat pracy biologicznej oczyszczalni PRIMAtech-E SBR


PRIMAtech-E SBR household sewage treatment plants are CE marked. This means that they meet the stringent requirements and comply with the PN-EN 12566-3+A2:2013 standard. The performance testing was carried out by a notified laboratory.
The PRIMAtech-E SBR treatment plant is a high-quality product that complies with European standards. This makes it an extremely attractive proposition for a biological wastewater treatment plant.

Biological treatment plant set-up with modern infiltration tunnels:

  • Preliminary settling tank with bioreactor,
  • Control box with Siemens PLC with electro-valves and blower (foundation is also included in the box),
  • Air ducts (4 x 5 m),
  • Extensions with structural wall h = 0.5 m (other dimensions on request),
  • EP100 infiltration tunnel with lids,
  • MSR-5 manhole with 5 outlets H = 850 mm,
  • PVC solid pipe 110 1 m,
  • PVC elbow 90º,
  • PVC aeration chimney.
Technical data of the biological treatment plant

Model of treatment plant
SBR 4
SBR 6
SBR 8
SBR 10
SBR 12
Number of users p.e.
2-5
6-7
8-10
10-12
12-14
Number of tanks [pcs.]
1
Tank capacity [m3].
3,0
4,0
5,0
6,0
7,0
EP100 infiltration tunnel [pcs].
25
35
40
50
60
Cover for tunnel EP100 [pcs.]
4
4
4
4
6
MSR-5 manhole [pcs.].
1
PVC 110 solid pipe 1 m [pcs.]
4
5
5
5
7
PVC elbow 90º [pcs.]
2
4
4
4
5
PVC aeration chimney [pcs.].
2
2
2
2
3
Inlet diameter [mm]
160
Product code
29-324
29-325
29-326
29-327
29-328

The wastewater treatment plant should be selected according to the daily throughput and the number of inhabitants. It is very important to plan its location correctly. A soil survey must also be carried out. You will find information on this in this guide. Details on installation can be found in the manufacturer's instructions. You are also welcome to contact us.

We also offer a version of this biological treatment plant with an infiltration drain. In addition, we also offer a biological sewage treatment plant with rotary settling tank with classic drainage and with infiltration tunnels.

Comments All reviews

Summary

5

(1 Reviews)

Select a row below to filter reviews.

  • 5
    (1)
  • 4
    (0)
  • 3
    (0)
  • 2
    (0)
  • 1
    (0)

Write a review

Grade
2025-03-19

Polecam

Idealne rozwiązanie dla małych działek. Tunele nie potrzebują geowłókniny, montaż ich jest dużo szybszy i łatwiejszy niż rur drenażowych. Polecam